EEVblog - YouTube
The EEVblog®NO SCRIPT, NO FEAR, ALL OPINIONAn off-the-cuff Video Blog about Electronics Engineering, for engineers, hobbyists, enthusiasts, hackers and Maker...
概览
收录于
2026年3月17日
学科与领域
computer-science-advanced · embedded-systems
年级范围
九年级(高一)–十二年级(高四)
页面类型
Video
关键词
electronics engineering maker design circuit hardware pic atmel oscilloscope multimeter diy hobby review teardown microcontroller arduino video blog tutorial...
简介
NBN Network Restoration Incident Report
- Incident Overview: A major NBN service outage was caused by third-party damage to fibre and conduit beneath a roundabout, requiring the replacement of over 400 metres of fibre.
- Restoration Status: As of 01-05-2026, fibre splicing is complete, and services are progressively restoring. Full restoration is expected within one hour of the final update.
- Key Challenges:
- Safety: Temporary cabling solutions were deemed unsafe due to the length required (450m–600m) and the need to traverse busy intersections and footpaths.
- Logistics: The repair required directional drilling and significant civil works.
- Regulatory Delays: Restoration was delayed by the need for Land Access and Road Opening permissions from the local council, which were unavailable during a long weekend/public holiday.
- Timeline of Key Events:
- 25-04-2026: Incident identified; temporary solutions ruled out due to safety risks and complexity.
- 28-04-2026: Council permissions granted; civil works team engaged.
- 29-04-2026: Initial drilling attempts failed due to high risk of further infrastructure damage; alternative routes assessed.
- 30-04-2026: Restoration design approved; civil crews and traffic control mobilized to site.
- 01-05-2026: Fibre cable installed; splicing commenced and completed; services restored.
用户评价
暂无已发布的评价,欢迎率先分享您的使用体验。